Our work

Experience You Can
Build On.

Selected work across active transport corridors, operational industrial sites and quarry environments.

Completed asphalt driveway curving around a planted island beside a residential home
Completed residential asphalt driveway.
Completed project · Residential client

A Finished Driveway.
A Practical Difference.

A completed residential asphalt driveway, with a broad turning area around an existing planted island and a finished surface alongside the home.

From driveways and carparks to commercial yards, our asphalt capability supports projects of different sizes.

Asphalt surfacingResidential drivewayCompleted work
Discuss your driveway
Roading contractor

Bay Of Plenty Pavement Renewal

Delivered approximately 17,000 m² of pavement rehabilitation and repairs within active transport corridors. The scope included failed pavement removal, granular reconstruction, asphalt reinstatement, compaction, testing and quality documentation.

17,000 m²approx. pavement rehabilitation
Live roadsworks within active transport corridors
Pavement rehabilitationAsphalt reinstatementQuality assurance
Roading contractor

Surfacing And Membrane Sealing

Delivered approximately 33,000 m² of tack coat application and 18,000 m² of membrane sealing, with trucking support. Our scope covered planning, resources, supervision, health and safety, physical works and quality assurance.

18,000 m²approx. membrane sealing
33,000 m²approx. tack coat application
Tack coatMembrane sealingTrucking support
Industrial client

New Commercial Carpark

Principal contractor

Constructed a 4,000 m² engineer-designed carpark. Works included foundation demolition, approximately 58 metres of stormwater pipe, granular pavement construction, two-coat chip sealing and an asphalt entrance.

4,000 m²engineer-designed carpark
58 mapprox. stormwater pipe
Demolition and drainagePavement constructionChip seal and asphalt
Quarry operator

Earthworks And Material Recovery

Principal contractor

Excavated and benched approximately 30,000 m³ of material. Processed and sorted approximately 15,000 m³ to recover around 5,000 m³ of suitable rip-rap, with stockpile management and removal of unsuitable material.

30,000 m³approx. excavated and benched
5,000 m³approx. suitable rip-rap recovered
Bulk earthworksMaterial processingResource recovery

Project referees and supporting certificates are available on request.

Let’s Talk About Your Next Project.

Send us your scope, site location and required timing. We’ll discuss the people, plant and services suited to the job.

Get in touch
Call 0800 963 282Make an enquiry ↗